Tuesday, March 31, 2015

Matthew Turner: Update

       Had a chat with the project manager of the construction of Tall Ship Matthew Turner, the all wood brigantine under construction in Sausalito, California.  Decking of the main deck has begun, a big step in the process.  In addition, word was received this week that the two custom built diesel fuel tanks have been put together in Sebastopol. These 1000lb. steel monsters will be installed port and starboard below decks in front of the aft water tight partition.   Before the final placement, the two will be epoxy coated for added protection to ensure long term usage.
     Inspection hatches were added to both tanks in the unlikely event they needed an interior inspection sometime during their useful life.  Better now than later.   Nice job by two veteran welders, Jeff and Don, experience boat builders from way back when.  Web site:educationaltallship.org

No comments:

Post a Comment

Biden Hosts Island Nation Leaders

       In the first ever meeting among Pacific allies, President Biden hosted a tripartite meeting in Washington, DC. His goal: to indicate ...